摘要
利用油气设计常用软件对某工程全线沿程温度变化进行模拟。本工程输油管道在冬季-10℃的低温情况与满足工程需要的前提下,最大停输时间为5 h 17 min。在停泵过程中,管道前端温降较快,后端则不是很明显。
Using oil and gas software used in some engineering design simulated riser temperature changes.In winter-10 ℃ low-temperature conditions and under the premise of the project need.The biggest stopping transportation time is five hours 17 minutes.The process of the pump stopped,the front end temperature drop faster,the back end is not very obvious.
出处
《广东化工》
CAS
2012年第11期98-99,共2页
Guangdong Chemical Industry
关键词
输油管道
停输
工况分析
oil pipeline
stop losing
condition analysis