水电站主坝工作桥拆除爆破技术及安全分析 被引量:1

DEMOLITION BLASTING TECHNOLOGY OF SERVICE BRIDGE ON MAIN DAM OF HYDROPOWER STATION AND ITS SAFETY ANALYSIS
下载PDF
导出
摘要 水丰水电站位于中朝界河鸭绿江上,其主坝工作桥拆除工程量大、实施难度高。通过周密的控制爆破方案设计和计算分析,将其成功拆除;且爆破振动速度、动水压力和涌浪等监测指标以及大坝裂缝、渗漏量等宏观现象调查均处于安全范围以内。 Shuifeng hydropower station locates in the Yalu River between China and North Korea. The service bridge on the main dam would be aismantled, which was large work quantity and high difficulty. It was successfully demolished by means of careful controlled blasting scheme design and calculation analysis, and the monitoring indexes such as the blasting vibration velocity, the hydrodynamic pressure, and the swell were all within the safety range and so were the macroscopic phenomena such as the dam crack and the seepage discharge.
出处 《工程爆破》 北大核心 2012年第3期66-69,共4页 Engineering Blasting
关键词 水电站主坝 工作桥 拆除爆破 爆破振动 动水压力 Hydropower station Main dam Service bridge Blasting vibration Hydrodynamie pressure
  • 相关文献

参考文献4

二级参考文献8

共引文献16

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部