摘要
通过对某滨海核电厂循环水管线地基及边坡工程的稳定性分析,提出合理的开挖坡度、开挖方案和工作程序。
Based water pipe in a work process are on the stability coastal nuclear put forward. analysis of foundation and slope engineering of the circulation power plant, the appropriate gradient, excavation scheme and
出处
《河北交通职业技术学院学报》
2012年第2期64-68,共5页
Journal of Hebei Jiaotong Vocational and Technical College
关键词
边坡工程
核电厂
循环水管线
基坑开挖
slope engineering
nuclear power plant
circulation water pipe
deep excavation