摘要
本文依照《工业与民用配电设计手册》(第三版),从一个超高层住宅实例中介绍有关柴油发电机容量选择的计算方法和步骤;重点讨论了消防负荷的确定过程,介绍了选择计算的方法。
In recent years,with the rapid development of our social economy and city center area land shortage,the national each big city construction scale is also constantly expanding development,one flickering high-rise buildings,city skyline once again extend.With the increasing of building volume,the emergency power supply requirements are also getting higher and higher,so the diesel generating set as a emergency power supply in the application of building more and more attention by the industry.To meet the power supply radius requirements under the premise,how to make the diesel generator set capacity as small as possible,the number of as little as possible,improve the economy,the key is a reasonable calculation of diesel generator load.In this paper,in accordance with the "industrial and civilian power distribution design handbook"(Third Edition),from a super high-rise residential examples are described in relation to diesel generator design calculation method and steps are discussed;fire load process,describes the selection method of calculation.
出处
《福建建筑》
2012年第9期103-105,共3页
Fujian Architecture & Construction
关键词
超高层住宅
住宅小区
发电机容量
消防负荷计算
Super high--rise residential buildings
Residential quarters
Generator capacity
Fireload calculation