摘要 为降低高承压水深基坑工程的突涌风险,在某地铁深基坑换乘站建设过程中,通过现场抽水试验及沉降监测,借助数值模拟为基坑减压降水进行方案优化。获取了承压含水层的水文地质参数,分析预测了三维渗流场及周边沉降的时空分布规律,提出了合理的降水优化方案,对类似工程具有借鉴意义。 To reduce the bursting risk of deep excavation engineering under high confined water during the con- struction of a subway transfer station, an optimization scheme was provided based on the field pumping tests and subsidence monitoring with the aid of numerical simulation. Through the analysis in the paper, the hydroge- ology parameters for the confined aquifer were defined, then the 3D seepage field and the space-time settlement distribution of the surrounding were forecasted, and the reasonable optimization dewatering scheme was put for- ward. This research provides reference for similar projects.
出处 《华东交通大学学报》 2012年第4期40-45,共6页 Journal of East China Jiaotong University
关键词 高承压水 抽水试验 数值模拟 减压降水 high confined water pumping test numerical simulation pressure reduction dewatering
  • 相关文献

参考文献8

二级参考文献37

共引文献304

同被引文献70

引证文献12

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部