摘要 针对石槽村煤矿水文地质条件复杂的状况,在井筒施工过程中,正式排水系统未形成之前,理想的防治水方案应该采取"以堵为主,以排为辅"的防治水措施,注浆是达到以堵治水的有效方案之一,对选择合理的注浆工艺、注浆材料及浆液浓度等相关参数进行论述。 For the complex hydrogeology condition of Shicao village coal mine, during shaft con- struction and before the formal drainage system put into use, the ideal method for the control of the water is the measures named "blocking is major and discharging is supplement", so grouting is one of the effec- tive measures that could control the water by blocking, choice of reasonable grouting technology, grouting material and proper slurry concentration and other related parameters were discussed.
出处 《现代矿业》 CAS 2012年第9期36-38,共3页 Modern Mining
关键词 井筒施工 治水 注浆技术 Shaft construction, Water control, Grouting technique, Research and application
  • 相关文献

同被引文献12

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部