摘要
结合西安市某大型污水处理厂生物池的结构特点,介绍了该工程大体积混凝土施工过程中温度裂缝的控制措施,以及所采取的测温方法。
Combining with the structure characteristics of one large biological tank of the sewage treatment plant in Xi'an, the controlling measures for the temperature cracks during the mass concrete construction process are introduced, as well as the temperature measuring method.
出处
《混凝土与水泥制品》
北大核心
2012年第10期69-71,共3页
China Concrete and Cement Products
关键词
大体积混凝土
温度控制
绝热温升
测温方法
Mass concrete
Temperature control
Adiabatic temperature rise
Temperature measuring method