6Anderson L, Brunner C. Substation Automation Based on IEC 61850 with New Process-Close Technology[A]. In: IEEE Power Tech Conference[C].Bologna (Italy): 2003.
7NxtPHASE.Arizona Public Service-case Study[EB/OL]. http://www. Nxtphase.com,2006.
8XtPhase. NxtPhase Optical Sensors Measurement Stability Over Time and Temperature[EB/OL].http://www. Nxtphase. com, 2006.
9Cleveland F.Xan thus Consulting International.IEC TC57: Security Standards for the Power System's Information Infrastructure-beyond Simple Encryption[S]. 2005.