该文以具体工程为例,对超载预压结合塑料排水板技术在滨海地区软土地基处理的相关参数进行研究,论述并总结了超载预压结合塑料排水板技术在滨海地区软土地基处理相关参数的确定方法。
The article studies the relative parameters of surcharge preloading combined with plastic drainage plate technology in soft soil subgrade treatment of coastal area by the engineering cases,and discusses and sums up the determining method of the relative parameters of surcharge preloading combined with plastic drainage plate technology in soft soil subgrade treatment of coastal area.
出处
《城市道桥与防洪》
2012年第9期38-41,327,共4页
Urban Roads Bridges & Flood Control
关键词
软土地基处理
塑料排水板
超载预压
工期
附加应力
自重应力
soft soil subgrade treatment,plastic drainage plate,surcharge preloading,project period,additional stress,deadweight stress