摘要
为解决溪洛渡水电站上游不规则平面尺寸部位边墙混凝土连续浇筑问题,对组合钢模的安装工艺进行了改进,成功实施了在组合钢施工工艺基础上的翻模施工技术。实践证明,使用该翻模技术,混凝土施工质量能得到保证,施工进度能得到控制,取得了良好的效果。
The installation technique for combined of steel mould is improved and the turnover formwork construction technology is implemented successfully in order to deal with concrete continuous pouring on side wall with irregular plane in the upper reaches of Xiluodu Hydropower Station. Practice shows that the use of this technology can ensure concrete construction quality, make construction schedule under control and achieved good results.
出处
《水电与新能源》
2012年第5期38-40,共3页
Hydropower and New Energy
关键词
溪洛渡水电站
翻模
水垫塘
边墙
Xiluodu Hydropower Station
turnover climbing formwork
plunge pool
side wall