摘要 我国煤与瓦斯突出防治的区域性措施有:开采保护层、预抽煤体中的瓦斯和煤层注水。针对如何解决大成煤业有限公司2号煤层在开采期间的瓦斯超标问题,采用分源预测法对2号煤层在开采期间的最大瓦斯涌出量进行了预测,结果显示,2号煤层在开采期间最大埋深处的瓦斯含量较高,因此,必须采用瓦斯抽采的方法来解决2号煤层的瓦斯超标问题,从而为2号煤层的安全生产提供保证。本文对2号煤层本煤层顺层瓦斯抽放和临近层顶板高抽巷瓦斯抽放的方法进行了理论分析,为解决2号和6号煤层的瓦斯问题提供了理论指导。 China's regional measures of coal and gas outburst prevention and treatment are mining protection layer, pre - pumping gas in coal and coal seam water injection. In order to solve gas overweight problems in mining peri- od of No. 2 coal seam in Dacheng coal limited company, adopting the forecast method of separate source predicts maximum amount of gas emission in mining period of No. 2 coal seam, the result shows that gas content of maximum cover depth in mining period of No. 2 coal seam is higher. Therefore, adopting gas drainage method to solve the No. 2 coal seam gas overweight problems is obligatory. Thus provides the guarantee for the production safety of No. 2 coal seam. This paper states the theoretical analysis cent layer roof high drainage roadway, provides coal seam of gas drainage methods of No. 2 coal seam along the layer and adjathe theoretical guidance for solving gas problems of No. 2 and No. 6
出处 《山西焦煤科技》 2012年第8期4-6,共3页 Shanxi Coking Coal Science & Technology
关键词 瓦斯抽采 瓦斯超标 顶板高抽巷 顺层抽放 Gas drainage Gas overweight Roof high drainage roadway Consequent drainage
  • 相关文献

参考文献5

二级参考文献20

共引文献376

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部