BOT项目投资与特许权期的二维招标合同设计 被引量:6

The Effect of Two-dimensional Tender Contract Design on Investment and Concession Term for BOT Projects
下载PDF
导出
摘要 为让管理水平较高的私营集团获得BOT项目特许权,并实现项目社会福利最大,本文利用机制设计理论建立了一个关于BOT项目投资与特许权期的二维招标合同的直接机制模型。通过模型分析,获得了该招标机制的可行性条件,最优形式和相应配置方案,并由一个算例表明,得到的最优招标机制在实际中是有效的。所获结果为政府对BOT特许权招标提供了一种理论指导和实际方法。 Tendering and bidding are two important trading mechanisms. However, many Build-Operate-Transfer (BOT) projects are having issues with the concession bid. For instance, private groups sometimes falsify bidding information in order to win a bid from Chinese government. Therefore, it is important to redesign tendering and bidding mechanisms in order to maximize the social welfare of a BOT project. There is a lack of study on concession tender issues for BOT projects. This paper investigates a two-dimensional tender problem associated with BOT project's investment and concession period. We also consider the effect of the concession period on the private investment in the tendering practice. A direct tendering mechanism model on BOT project's investment and concession period is proposed according to the mechanism design theory. The proposed model can help derive the feasible condition, optimal form, and corresponding distribution program for the implementation of tendering mechanism. Firstly, it is difficult for the government to know the private group's information, such as themanagement level in the tendering process. A direct tendering mechanism model on the BOT project's investment and concession term is proposed. The model enables us to obtain the optimal direct tender mechanism and test its feasibility. Secondly, to select the private group with the highest management level for the project implementation, the distribution program for the BOT project's concession tender is discussed based on the analysis of optimal direct tender mechanism. The discussion results indicate that the BOT concession tender with the inclusion of the competing bidding variable can not only help the government choose a private investor with the highest management level from the fury competing market, but also maximize the project's benefits. Finally, the analysis of a computing example shows that the obtained conclusions not only are valid and applicable, but also provide the government with a theoretical guidance and a practical approach for implementing BOT project's concession tender.
出处 《管理工程学报》 CSSCI 北大核心 2012年第3期191-196,共6页 Journal of Industrial Engineering and Engineering Management
基金 国家自然科学基金重点资助项目(70831002) 国家自然科学基金资助项目(71173103 70971061 71101069) 教育部人文社会科学研究一般资助项目(10YJA790183) 教育部人文社科青年基金资助项目(12YJCZH017) 江苏省社会科学基金资助项目(09EYB010) 江苏省普通高校研究生科研创新计划资助项目(CX10B_020R)
关键词 BOT项目 项目投资 特许权期 招标合同 最优机制 BOT project project investment concession term tender contract optimal mechanism
  • 相关文献

参考文献15

  • 1Min CL. Contract design of private infrastructure concessions [ D ]. University of California, Berkeley ,2000.
  • 2Mills G. Welfare and profit divergence for a tolled link in a road network[ J]. Journal of Transport Economics and Policy, 1995,29:137 - 146.
  • 3Kumarsawamy MM, Zhang XQ. Governmental role in BOT-led infrastructure development [ J ]. International Journal of Project Management ,2001,19 : 195 - 205.
  • 4李启明,申立银.基础设施BOT项目特许权期的决策模型[J].管理工程学报,2000,14(1):43-46. 被引量:94
  • 5Shen LY,Li QM. Alternative concession model for build operate transfer contract projects [ J ]. Journal of Construction Engineering and Management, 2002,128 ( 4 ) : 326 - 330.
  • 6Shen LY, Wu YZ. Risk concession model for build operate transfer contract projects [ J ], Journal of Construction Engineering and Management,2005,131 ( 2 ) :211 - 220.
  • 7秦旋.基于CAPM的BOT项目特许期的计算模型[J].管理工程学报,2005,19(2):60-63. 被引量:52
  • 8肖条军,盛昭潮,周晶.交通BOT项目投资的对策分析[J].经济数学,2002,19(4):40-46. 被引量:7
  • 9杨宏伟,周晶,何建敏.基于博弈论的交通BOT项目特许权期的决策模型[J].管理工程学报,2003,17(3):93-95. 被引量:80
  • 10Che YK. Design competition through multidimensional auctions [ J ]. ROAND 1ournal of Economics, 1993,24:668 - 680.

二级参考文献31

  • 1叶陈云,罗会强.BOT模式及其对我国高速铁路融资的启示[J].财会通讯(理财版),2007(3):90-92. 被引量:10
  • 2赵宏良.我国建设工程项目的BOT融资方式应用分析[J].经济师,2005(10):277-277. 被引量:2
  • 3郭凤平,齐二石,刘晓峰.城市基础设施建设项目融资的BOT模式[J].天津大学学报(社会科学版),2006,8(1):54-58. 被引量:18
  • 4NAO. Modernizing construction [R].Reported by the Comptroller and Auditor General, National Audit Office, London, 2001.
  • 5NAO. Managing the relationship to secure a successful partnership in PFI projects [R]. Reported by the Comptroller and Auditor General, National Audit Office, London, 2001.
  • 6NAO. PFI: construction performance [R]. Reported by the Comptroller and Auditor General, National Audit Office, London, 2003.
  • 7Ezilike E I, Perry J G, Hawash K. The barriers to entry into the PFI market [J]. Engineering, Construction and Architectural Management, 1997(3):179-193
  • 8AusCID. Australia at a crossroads-public/private partnerships or perish? Finance and legal issues [EB/OL]. The Australian Council for Infrastructure Development, Available from http://www.auscid.org.au/.
  • 9Marcus A and Graemebowles. Public-private partnership and contract negotiations: an empirical study [J]. Construction Management and Economics,2004 (3) : 26-87.
  • 10Saunders A. Aspects of funding for BOO projects[J]. Engineering, Construction and Architectural Management,1998 ( 1 ) :22-30.

共引文献157

同被引文献60

  • 1秦旋.基于CAPM的BOT项目特许期的计算模型[J].管理工程学报,2005,19(2):60-63. 被引量:52
  • 2王健,安实,赵泽斌.基于财政补贴的拥挤定价下公交收费策略研究[J].管理工程学报,2006,20(2):84-88. 被引量:19
  • 3殷红,王先甲.互补性物品的最优拍卖机制[J].系统工程理论与实践,2006,26(9):60-65. 被引量:8
  • 4杨屹,郭明靓,扈文秀.基于期权博弈的基础设施BOT项目二阶段特许权期决策模型[J].中国软科学,2007(6):81-85. 被引量:18
  • 5李春好,曲久龙.项目融资[M].北京:科学出版社,2008.
  • 6MALINI E. Build operate transfer municipal bridge projects inIndia[J]. Journal of Management in Engineering,1999,15(4):51-58.
  • 7EBRAHIMNEJAD Sadoullah,MOUSAVI Seyed Meysam,SEYRAFIANPOURHamed. Risk identification and assessmentfor build-operate-transfer projects:A fuzzy multi attribute decisionmaking model[J]. Expert Systems with Applications,2010,37:575-586.
  • 8TIONG Robert L K,ALUMJahidul. Evaluation of proposals forBOT projects[J]. International Journal of Project Management,1997,15(2):67-72.
  • 9ANTHONY C,KITTI S. Analysis of regulation and policy ofprivate toll roads in build-operate-transfer scheme under de-mand uncertainty[J]. Transportation Research:Part A,2007,41(6):3883-3898.
  • 10KUNMARASWAMYMM,ZHANG X Q. Governmental role inBOT-led infrastructure development[J]. International Journal ofProject Management,2001,19:195-205.