3Halpin D W . CYCLONE-A method for modeling job site processes [ J ]. Journal of Construction Division, ASCE,1977, 103 (3) : 489-499.
4Paulson B C. Interactive graphics for simulating construction operation [ J ]. Journal of Construction Division, ASCE,1978,104( 1 ) :25-38.
5Chang D Y. RESQUE: a resource based simulation system for construction process planning[ D]. Michigan : University of Michigan, 1986.
6Ioannou P G. UM-CYCLONE Reference Manual[ M ]. Michigan : University of Michigan, 1987.
7Liu L Y. COOPS: construction object-oriented simulation system[ D]. Michigan : University of Michigan, 1991.
8Huang R Y, Halpin D W. Visual construction operations simulation-the DISCO approach[ J]. Journal of Microcompater in Civil Engineering,1994, 9(2) :175-184.
9Martinez J C. STROBOSCOPE: state and resource based simulation of construction processes [ D ]. Michigan : University of Michigan, 1996.
10Koo B,Fischer M. Feasibility study of 4D-CAD in commercial construction [ J ]. Journal of Construction Engineering and Management, ASCE ,2000 ,126 (4) :251-260.