4Nobuaki Otsuki, Shin. ichi Miyazato, Nathaniel B. Diola, et al. Influences of Benng Crack and Water. Cement Ratio on Chloride Induced Corrosion of Main Reinforcing Bars and Stirmps [J]. AcI Materials Journal ,2000,97(6):454-464.
5Corina-Maria Aldea, Surendra P. Shah, Member. ASCE, et al. EFFECT OF CRACKING ON WATER AND CHLORIDEPERM EABILITY OF CADNCRETE[J ]. Journal of Materials in Civil Engineering, 1999,11 (3) : 181 - 187.
6Kejin Wang, Daniel C, Jansen. Surendra P. Shal. Permeability study ofcracked concrete [ J ]. Cement and Concrete Research, 1996(27) :381-393.
7ASTM C1202-94 Standard Test Method for Electrical indication of Concrete Ability to Resist Chloride Ion Penetration, 1994.
8Luping Tang. Concentration dependence of diffusion and migration of chloride ions:Part 1. Theoretical eonsiderations[J ]. Cement and Concrete Research, 1999(29) : 1463-1468.
9Luping Tang. Concentration dependence of diffusion and migration of chloride ions: Part 2. Experimental evaluations[J ]. Cement and Concrete Research, 1999(29) : 1469-1474.
10K. Stanisha, R. D. Hooton, M. D. A. Thomas. A novel method for describing chloride ion transport due to an electrical gradient in concrete: Part 1. Theoretical description [J ]. Cement and Concrete Research, 2004 (34): 43-59.