期刊文献+

切割水位法在赤坎水文站推流定线的应用 被引量:2

Application of cutting level method in flow calculation and level-flow relation curve determination at Chikan Hydrologic Station
下载PDF
导出
摘要 赤坎水文站下游5 km处有北河桥闸,该站的水位流量关系规律受其调控影响波动较大且难以掌握变化规律。该站2000年以前采用临时曲线法来定线推流,但受北河桥闸调控影响点多且分散,推流定线难度大大增加且难以掌握变化规律,目前主要采用切割水位法对赤坎站水位流量关系进行定线推流。从近10年的整编结果来看,采用切割水位法进行推流所得出的成果与采用临时曲线法所得的成果比较吻合,符合本站的水文特性,资料合理,可供使用。 The level-flow relation curve out of Chikan Hydrologic Station is characterized by significant fluctuation and unclear rule due to control from the Beihe Bridge gate 5km downstream of the station. Temporary curve method was used by Chikan Hydrologic Station before 2000 year, rendering much difficulty and uncertainty. According to last 10 years of records, the results out of cutting level method are basically identical with that out of temporary curve method, conform to the hydrological features of this station, which demonstrate that cutting level method is practicable and is able to contribute reasonable data.
作者 杨洁鸿
出处 《广西水利水电》 2012年第4期8-10,共3页 Guangxi Water Resources & Hydropower Engineering
关键词 赤坎水文站 切割水位法 定线推流 应用 Chikan Hydrologic Station cutting level method level-flow relation curve determination and flow calculation application
  • 相关文献

参考文献4

二级参考文献4

  • 1水利部.GB50179-93河流量测验规范[S].北京:中国计划出版社,1993.
  • 2SL337-2006声学多普勒流量测验规范[S].北京:中国水利水电出版社,2006.
  • 3广东省水文局惠州分局.广东省惠州地区水文资料统计手册[R].惠州:广东省水文局惠州分局.
  • 4GB50179-93.河流流量测验规范[S].[S].,..

共引文献154

同被引文献18

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部