摘要
分析了老口航运枢纽的通航条件和现状通航情况。由于工程位于通航河道,施工期不可避免会影响通航。通过施工期水力计算、水文资料分析和水工模型试验验证,提出了施工期临时通航航道设计和安全措施。
Analysis was made on the navigable conditions and current navigation situation of Laokou Complex. Because the project is located on a navigable river course, navigation will be affected inevitably during construction period. Temporary navigation way and safety-guard measures were designed based on the results of hydraulic calculation, hydrological data analysis and hydraulic model test.