摘要
介绍了新疆克孜尔水库的工程概况及存在的泥沙淤积问题。论述了水库除险加固的两个方案:坝体最大加高方案和降低堰顶高程方案,经过对两方案的投资和施工难度比选,推荐坝体最大加高方案作为实施方案。
A brief introduction was made on the general and sedimentation problem of Kizil Reservoir located in Xinjiang Uygur Autonomous Region. For its reinforcement, the max. dam-body heightening alternative was recommended after comparison with the weir crest lowering alternative in respects of cost and construction difficulty.
出处
《广西水利水电》
2012年第4期33-36,45,共5页
Guangxi Water Resources & Hydropower Engineering
关键词
克孜尔水库
除险加固
坝体最大加高
降低堰顶高程
Kizil Reservoir
reinforcement
max. dam-body heightening amplitude
lowering weir crest elevation