摘要
简要介绍了北海市铁山港区供水工程(近期、二期)输水玻璃钢夹砂管道的施工方法、工艺及注意事项等。目前工程已完工,近期已通过竣工验收,并投运,二期试运行正常,正准备竣工验收。
A brief introduction was made on the construction methods, technique and notes of glass reinforced plastic mortar pipe (GRPMP) at the lst-and 2nd-stage Tieshangang Area water supply project of Beihai City. With construction being completed, the project had been put into normal operation. The lst-stage project was examined and the 2nd-stage-projecte is ready for as-built examination.
出处
《广西水利水电》
2012年第4期42-45,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
玻璃钢夹砂管道
选择
安装
施工
Glass reinforced plastic mortar pipe (GRPMP)
selection
installation
construction