企业可利用分时电价通过合理转移负荷用电时间达到节约电费开支的目的。分析了企业生产流程中制约负荷转移优化控制的因素,介绍了建立的一种基于分时电价的企业负荷转移优化控制模型,在煤矿生产系统的应用表明可有效节约电费开支。
By means of time-of-use(TOU)power price to transfer load time reasonably, enterprises can' save electricity cost. Optimal control factors of restricting load transfer in the production progress Of enterprises are analyzed. A built optimal control model for load transfer of enterprise based on TOU power price is introduced. It has been proven to save electricity cost effectively when applied in a production system Of coal mine.