摘要 丰满水电站泄洪洞增建发电支洞后,原闸门的功用发生较大变化,其上部的配重箱占位、充水阀操作方式等存在不足,已很不适应检修、维护、操作需要。通过对闸门实施改造优化设计,在不改变水工结构前提下较好地消除了技术缺陷,保证了闸门可靠运行和检修需要。 After building branch tunnel in Fengman hydropower station, the function of the old gate changes greatly. Shortcomings ex- ists in the upper loaded vans available in sites and the water filling valve, making it difficult for repairing, maintenance and operation. Through the implementation of the optimization on the gate, technical defects are eliminate, not changing the hydraulic structure, thus ensuring reliable operation and maintenanee needs.
出处 《东北电力技术》 2012年第8期39-42,共4页 Northeast Electric Power Technology
关键词 丰满水电站 事故闸门改造 优化设计 洪泄洞 Fengman Hydropower Station Emergency gate transform Optimized design Flood discharging tunnel
  • 相关文献

参考文献5

二级参考文献1

  • 1DL5039-1995,水利水电工程钢闸门设计规范[S].

共引文献3

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部