1Pellegrinelli Sergio, Partington David, Hemingway Chris, et al. The importance of context in programme management: An empirical review of programme practices [ J ]. International Journal of Project Management, 2007, 25 (1): 41-55.
2Shehu Zayyana, Akintoye Akintola. Major challenges to the successful implementation and practice of programme management in the construction environment: A critical analysis [ J]. International Journal of Project Management, 2010, 28 (1): 26-39.
3Singer James E. Engineering program management [ J 1. Engineering Management Journal, 2009, 21 (3): 38-39.
4Gaydar Michael. System Engineering and program management [ C ] //AHS International 64th Annual Forum Proceedings. Alexandria: AHS International, 2008: 1640-1644.
6Jagathipriya, R P Byali, M V Kannan. Critical chain project management -A new project management philosophy for multi project environment [ J]. Journal of Spacecraft Technology, 2008, 18 (1): 30-36.
2Bertalanfft L V.Generalsystem theory:foundation,development application[M].NewYork.1973.
3上海世博会工程建设指挥部办公室.2010年上海世博会项目建话大纲(2009版).2009.
4WILLIAMS G B. The Boeing commercial airplane engineering simulation, new airplane project, management observations[A]. Procecedings of the AIAA Modeling and Simulation Technologies Conference[C]. New Orleans, LA, USA: American Institute of Aeronautics and Astronautics, 1997,341 - 350.
5BENEDETTI D A. GALILEO risk management process[A].Procecedings of the AIAA Guidance, Navigation, and Control Conference and Exhibit[C]. Montreal,Canada:American Institute of Aeronautics and Astronautics,2001.1- 6.
6ALEXANDROV M,GELBUKH A,MAKAGONOV P. Evaluation of thematic structure of multidisciplinary documents and document flows [A]. 2000 Proceedings 11th International Workshop[C]. Greenwich, U. K.: IEEE Computer Society Press,2000. 125- 129.
7ZHAO J L. Workflow- centric distribution of organizational knowledge: the case of document flow coordination[A]. 2002HICSS. Proceedings of the 35th Annual Hawaii International Conference [C]. HI, USA: IEEE Computer Society Press,2002. 3796-3803.
8LUDWIG H,WHITTINGHAM K. VEC: gateways for cross-organizational document flow[J]. Multimedia, IEEE, 2000,7(4) :62-72.
9R. Koliscg, R. Padman, An integrated survey of deterministic project scheduling[J ]. OMEGA International Journal of Management Science,2001, (30) :249 - 272.
10John H Payne, J Rodney Turner. Company - wide project management: the planning and control of programmes of projects of differ ent type[J]. Internation Journal of project Management, 1999 (1)..55-59.
9Van Donk D P, Molloy E. From organising as projects to projects as organizations[J]. International Journal of Project Managem- ent, 2008(26): 129-137.
10D.R. Ogunsemi, GO. Jagboro. Time-cost model for building projects in Nigeria[J].Article provided by Taylor and Francis Journals in its journal Construction Managementand Eco- nomics, 2006 : 263-258.