摘要 在广州市地铁6号线某建筑桩基托换工程中,采用钻孔灌注桩+托换梁的方法对桩基进行托换。介绍了桩基托换技术的施工工艺和注意事项,重点介绍了托换工程中的施工监测,对监测结果进行了分析,并对托换梁的差异沉降进行了计算。监测结果证明了该技术的可行性与合理性。 Bored piles and underpinning beam have been adopted for the pile underpinning of a building during the construction of Guangzhou Subway Line 6. This paper introduces the construction technique and key points worthy of attention. Construction monitoring during the pile underpinning process was highlighted. The monitoring results were analyzed and the differential settlement of the underpinning beam was calculated. Monitoring results show that this technology is reasonable and applicable.
出处 《施工技术》 CAS 北大核心 2012年第10期16-18,44,共4页 Construction Technology
基金 国家自然科学基金项目(50908091)
关键词 地下工程 地铁 桩基托换 沉降 监测 underground subways pile underpinning settlement monitoring
  • 相关文献

参考文献6

二级参考文献22

共引文献62

同被引文献76

引证文献10

二级引证文献68

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部