摘要
结合李沧宝龙城市广场项目实际情况,从政府部门的角度探讨了该项目管理中的进度控制,提出应合理编制控制性计划,严格图纸会审,重视进度计划的审批,建立进度动态控制体系,以确保工程进度始终处于受控状态。
Combining with the fact of the Baolong Urban Square program of Licang district.The paper explores the progress of the management in the program from the government departments,points out the controlling plan should be compiled reasonably,the graph joint checkup should be strict,the approval of the progress planning be emphasized,and the progress dynamic control system be established,so as to ensure the engineering progress can be controlled all the time.
出处
《山西建筑》
2012年第30期266-267,共2页
Shanxi Architecture
关键词
进度控制
图纸会审
进度计划
动态控制
progress control
graph joint checkup
progress planning
dynamic control