摘要
就中介机构对跟踪审计的流程和整个过程的作业重点进行了分析,从工程前期、施工过程、竣工结算等几个方面进行了论述,并提出了相关的硬件配置和质量控制方法,以实现建筑工程跟踪审计规范化。
The paper analyzes the follow-up auditing procedure and main points by the intermediary agency,indicates from the preparation period of the project,the construction process,and the complete settlement,and points out the relative hardware allocation and quality control,so as to regularize the follow-up auditing in the construction projects.
出处
《山西建筑》
2012年第30期276-278,共3页
Shanxi Architecture
关键词
中介机构
跟踪审计
审核
合同
硬件配置
intermediary agency
follow-up auditing
auditing
contract
hardware allocation