重庆“嘉陵帆影”二期超高层塔楼结构设计挑战 被引量:4

Structural design challenge of super high-rise tower building of CQ TP2
原文传递
导出
摘要 重庆"嘉陵帆影"二期超高层塔楼结构高440m(94层),是集酒店和办公为一体的综合楼,建成后是中国西南地区第一高楼。该建筑立面复杂,塔楼外框柱均为斜柱且存在分支转换情况,结构体系由低区框架-核心筒+伸臂桁架+腰桁架结构体系在380m高空转换为带支撑的纯钢结构体系。主要描述该超高层结构设计中所遇到的难点及解决方法,包括竖向构件外框柱和剪力墙的布置及选择、结构荷载的取值、整体结构的加强层布置及优化、"地圆天方柱"以及"分肢柱"等复杂节点的有限元分析和设计、结构构件的抗震性能目标等。 The project of super high-rise tower building of CQ TP2 will be the tallest building in the southwest of China.It is a collection of hotels and office for the integration of complex building with 94 layers,and the height is 440m.The out shape of the tower is complicated with lots of sloping columns and split columns.The structural system changed from concrete frame-core wall+belt trusses+outriggers system at lower zone into a pure braced steel system at the height over 380m.The design difficulty and solution were illustrated,including the selection and arrangement of shear wall and frame columns,loading selection,layout and optimization of the strength floor,finite element analysis and design of "square upside and circle downside columns" and "split columns",seismic performance objectives of the structural components.
作者 朱立刚 卢玲
出处 《建筑结构》 CSCD 北大核心 2012年第10期33-40,共8页 Building Structure
关键词 超高层建筑 复杂斜柱 分肢柱 双重抗侧力体系 复杂节点 弹塑性分析 抗震性能目标 变截面梁 super high-rise building complicated sloping column split column dual lateral force resisting system complicated joint elastic-plastic analysis seismic performance objective hunch beam
  • 相关文献

参考文献5

  • 1朱立刚,张志强,梁金桐.重庆“嘉陵帆影”二期超高层塔楼设计与研究[J].建筑结构,2012,42(S1):251-260. 被引量:1
  • 2GB50011-2010建筑抗震设计规范[S].北京:中国建筑工业出版社,2010.
  • 3重庆市地震工程研究所?重庆市渝中区化龙桥超高层建设工程场地地震安全性评价报告[R]. 2008.
  • 4JGJ3-2010高层建筑混凝土结构技术规程[S].北京:中国建筑工业出版社,2011.
  • 5徐培福,傅学怡,王翠坤,等.复杂髙层建筑结构设计[M].北京:中国建筑工业出版社,2005.

共引文献1068

同被引文献27

  • 1方超,裴茂祥,郑春林,王宏斌,苟兴文.厦门高崎国际机场T4航站楼结构设计[J].浙江建筑,2013,30(9):25-28. 被引量:2
  • 2吕西林.钢筋混凝土结构非线性有限元理论与应用[M].上海:同济大学出版社,2002..
  • 3JGJ3_2010高层建筑混凝土结构技术规程[S].北京:中国建筑工业出版社,2011.
  • 4Choi S M, Yun Y S, Kim J H. Experimental study on seismic performance of concrete filled tubular square column-to-beam connections with combined cross diaphragm[ J ]. Steel and Composite Structure, 2006,6 (4) :303-317.
  • 5Fu G,Morita K, Ebato K. Structural behavior of beam- to-column connection of concrete filled circular tube column and H-beam space subassemblage [ J ]. Journal of Structural and Construction Engineering, 1998,508 (7) :157-164.
  • 6Campione G, Scibilia N. Beam-column behavior of concrete filled steel tubes [ J ]. Steel and Composite Structures, 2002, 2(4):259-276.
  • 7De Nardin S, E1 Debs A L H C. An experimental study of connections between I-beams and concrete filled steel tubular columns [ J ]. Steel and Composite Structures, 2004,4(4) :303-315.
  • 8Fujimoto T, Inai E, Kai M, et al. Behavior beam-to-column connection of CFT column system [ C]// The 12'h WCEE. Auckland, New Zealand: Griffith University, 2000: No. 2197 : 1-8.
  • 9Elremaily A, Azizinamini A. Experimental behavior of steel beam to CFT column connections [ J ]. Journal of Constructional Steel Research ,2001,57 (10) :971-995.
  • 10Elremaily A, Azizinamini A. Behavior and strength of circular concrete-filled tube columns [ J ]. Journal of Constructional Steel Research, 2002, 58 ( 12 ) : 1567- 1591.

引证文献4

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部