摘要 针对东滩煤矿原有的主井装载电控系统的软、硬件问题,采用S7-300PLC作为装载系统地面的主控,采用分布式I/O设备ET200M负责井底装载设备的现场数据采集与控制,主控PLC与ET200M之间通过PROFIBUS总线进行数据交换,并采用WinCC组态技术实现了将装载系统监控界面集成到提升系统的监控界面中。 Aiming at hardware and software problems of electric control system in original main shaft loading equipment of Dongtan coal mine.Using S7-300PLC as the main control of loading system ground and taking distributed I/O equipment ET 200M to gather and control field data of bottom loading equipment,the data interchange between main control PLC and ET200M is achieved by PROFIBUS bus.Loading system monitoring interface is integrated to the monitoring interface of lifting system by using WinCC configuration technology.
出处 《煤矿安全》 CAS 北大核心 2012年第10期119-122,共4页 Safety in Coal Mines
基金 山东省高校矿山安全监测技术与系统重点实验室资助项目
关键词 S7-300 PLC WinCC组态技术 电控系统 主井装载 S7-300 PLC WinCC configuration technology electric control system main shaft loading equipement
  • 相关文献

参考文献3

  • 1西门子(中国)有限公司自动化与驱动集团.深入浅出西门子S7-300PLC[M].北京:北京航空航天大学出版社,2004
  • 2西门子(中国)有限公司自动化与驱动集团.深入浅出西门子WinCCV6[M].第2版.北京:北京航空航天大学出版社,2005.
  • 3Josef Weigmann,Gerhard Kili.西门子PROFIBUS工业通信指南[M].第2版.北京:人民邮电出版社,2007.

共引文献52

同被引文献3

  • 1白宏峰,李文德,盛团秀.双箕斗提升主井Y形装载封闭闸门的若干组合[J].煤炭科学技术,2005,33(2):26-28. 被引量:1
  • 2西门子(中国)有限公司自动化与驱动集团.深入浅出西门子S7-300PLC[M].北京:北京航空航天大学出版社,2004
  • 3西门子(中国)有限公司自动化与驱动集团.深入浅出西门子WinCCV6[M].北京:北京航空航天大学出版社,2005

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部