期刊文献+

基于粒子群算法的采煤机单向示范刀采样轨迹规划 被引量:8

Based on Particle Swarm Optimization Planning of Shearer Sampling Trajectory of Single Demonstration Cutter
下载PDF
导出
摘要 考虑到采煤工艺和工作面的设备适应能力的限制,为提高单向示范刀采样轨迹与记忆截割轨迹的吻合度,探讨单向截割信息转换为双向截割信息的条件,建立基于粒子群算法截割轨迹规划数学模型,通过粒子群算法对截割参数进行规划,给出采煤机顶板记忆截割轨迹,利用Matlab软件对滚筒超调截割岩石或过低留顶煤的单向示范刀采样轨迹进行规划。 Taking into account mining technology and adaptability limitations of working face equipment, to improve the goodness of fit of trajectory of single demonstration cutter sampling and memory-cutting, discussed conditions of single demonstration cutter information converted to bidirectional demonstration cutter information, a cutting trajectory planning mathematical model which based on particle swarm algorithm is established, and then planning cutting parameters by particle swarm optimization, given memory-cutting trajectory of roof, use Matlab software to planning single demonstration cutter sampling trajectory of drum over adjustment cutting rock or low stationary coal roof.
出处 《煤矿机械》 北大核心 2012年第11期51-53,共3页 Coal Mine Machinery
基金 教育部科学技术研究重点资助项目(206045) 国家自然科学基金资助项目(51074068) 黑龙江省研究生创新科研资金项目(YJSX2011-166HLJ)
关键词 单向示范刀记忆截割 粒子群算法 轨迹规划 single demonstration cutter memory-cutting particle swarm optimization trajectory Dlanning
  • 相关文献

参考文献6

二级参考文献22

  • 1刘春生,侯清泉.采煤机滚筒自动调高记忆程控再现模式[J].煤矿机电,2004,25(5):22-24. 被引量:17
  • 2李春华,刘春生.采煤机滚筒自动调高技术的分析[J].工矿自动化,2005,31(4):48-51. 被引量:30
  • 3刘春生,杨秋,荆凯.采煤机滚筒调高记忆程控采样周期[J].煤矿机电,2006,27(4):38-39. 被引量:3
  • 4Hargrave C O, Ralston J C, Hainsworth D W. Optimizing wireless LAN for long-wall coal mine automation [ J ]. IEEE Transactions on Industry Applications, 2007, 43 (6) : 111 - 117.
  • 5Reid D C, Hainsworth D W, Ralston J C. Long-wall shearer guidance using inertial navigation [J]. Australian Mining, 2001, 80 (5): 31-36.
  • 6Steven A, Hofmeyr S. Architecture for an artificial immune system [J]. Journal of Evolutionary Computation, 2000, 25 : 3 - 8.
  • 7Kelly M, Hainsworth D, Reid D, et al. Progress towards long-wall automation [J]. Mining Science and Technology, 2005, 16 (5): 769-776.
  • 8Reid D C, Hainsworth D W, Ralston J C, et al. Shearer guidance: a major advance in long-wall mining [J]. Field and Service Robotics: Recent Advances in Research and Application, 2006, 24:469 -476.
  • 9Yang T M, Xiong S B. Application of wavelet neural network for automatic ranging cutting height of shearer [ J ]. Wavelet Analysis and its Applications (WAA), 2003, 12 (6) : 478 -483.
  • 10Hargrave C O, Ralston J C, Hainsworth D W. Optimizing Wireless LAN for Long-wall Coal Mine Automation[J]. IEEE Transactions on Industry Applications, 2007, 43 (6) :111-117.

共引文献106

同被引文献163

引证文献8

二级引证文献61

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部