摘要
建设项目全过程造价控制包括:项目投资决策阶段造价控制、设计阶段造价控制、招投标阶段造价控制、施工阶段和竣工结算阶段造价控制,投资控制应贯穿于建设项目始终,项目费用的控制离不开每一个阶段和环节。
The cost control of the whole process of construction projects includes the cost control of project investment decision-making phase, design phase cost control, cost control in the the bidding stage, cost control of construction phase and the completion settlement phase. The investment control should run through the construction project, the control of project cost can not be separated from each stage and link.
出处
《价值工程》
2012年第30期114-115,共2页
Value Engineering
关键词
建设项目
全过程
造价控制
construction project
the whole process
cost control