摘要 换流站绝缘配合是±1 100 kV特高压直流输电工程的关键技术之一,对降低设备的制造难度具有重要意义。提出±1 100 kV特高压直流输电工程的仿真计算用模型;对系统稳态运行电压和操作过电压进行了仿真研究和总结;在避雷器性能老化试验的基础上,详细介绍了采用高性能避雷器降低设备绝缘水平的可行性;给出了±1 100 kV特高压直流输电工程设备冲击绝缘水平的推荐值和绝缘裕度。 Insulation coordination inside the converter station is one of the key technologies for ±1 100 kV UHVDC power transmission project and it is of significance to reduce the manufacturing difficulty of related equipments.A model for the simulation and calculation of ±1 100 kV UHVDC power transmission project is proposed;and steady-state operation voltage and switching impulse of ±1 100 kV UHVDC system are simulated and summarized.Based on the ageing test of arrester performance,the feasibility of reducing insulation level of equipments by high-performance arresters is presented in detail,and recommended values of impulse insulation levels and insulation margins of equipments for ±1 100 kV UHVDC power transmission project are given.
出处 《电网技术》 EI CSCD 北大核心 2012年第10期55-60,共6页 Power System Technology
关键词 ±1100kV直流输电 过电压 绝缘配合 避雷器 ±1100 kV UHVDC power transmission project overvoltage insulation coordination arrester
  • 相关文献

参考文献30

二级参考文献162

共引文献1215

同被引文献234

引证文献24

二级引证文献273

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部