摘要 为确保地铁竖井及龙门吊的安全运行,在基坑开挖前对龙门吊附件的地基进行注浆加固。工程采用二重管A、B(C)无收缩双液WSS工法、水泥-水玻璃双液浆,对16.5m/14.5m范围内地基进行注浆加固。本工程钻孔深度大,回填土土质复杂,距离龙门吊等构筑物距离近,具有很大的施工难度。注浆加固后龙门吊未出现明显位移和沉降,注浆加固效果良好。 To ensure the safety of underground shaft and gantry crane operation, the groundsill nearby gantry crane was reinforced by grouting before the pit excavation. The groundsill ranged between 16.Sm/14.Sm was grouting reinforced by double pipe A, B ( C ) non shrinkage double liquid WSS method and cement-soluble glass double slurry. The project is difficult because of the deeper drill hole, complex backfill soil and the gantry crane is close to the constructions. The displacement and subside of gantry crane not occurred evident, and the effect of grouting reinforcement was good.
出处 《工程质量》 2012年第10期48-50,共3页 Construction Quality
关键词 龙门吊 注浆 无收缩双液工法 gantry crane grouting non shrinkage double liquid method
  • 相关文献

同被引文献12

引证文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部