1Barbarosoglu G, Ozg ti r D.Hierarchical design of an integrated production and 2-echeIon distribution system[J].European Journal of Operational Research, 1999,118(3) : 464-484.
2Sarker B R, Diponegoro A. Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers[J].European Journal of Operational Research,2008,194 ( 3 ) :753- 773.
6Dudek G,Stadtler H.Negotiation-based collaborative planning in divergent two-tier supply ehains[J].International Journal of Production Research, 2007,45 ( 2 ) : 465-484.
7Li H Y, You T H, Luo X Y.Collaborative supply chain planning under dynamic lot sizing costs with capacity deeision[J].Janrnal of Systems Engineering and Electronics, 2011,22 (2) : 247-256.
8Hernandez JE, Mula J, Poler R, Pavon J.A multi-agent negotiation based model to support the collaborative supply chain planning process[J].Studies in Informatics and Control, 2011,20( 1 ) : 43-54.
10Kazemi A,Zarandi M,Husseini S.A multi-agent system to solve the production distribution planning problem for a supply chain:a genetic algorithm approach[J].2009,44( 1 ) : 180-193.
9Veen, J. , Venugopal, V.. Using revenue sharing to create win-win in the video rental supply chain[J].Journal of Operational Research Society, 2005, 56 (3) : 757-762.
10Cachon, G. P. , Lariviere, M. A.. Supply chain coordination with revenue-sharing contracts: Strengths and limitations [J].Management Science, 2005, 51 (1): 30 -44.
5Mary J. Meixell, Vidyaranya B. Gargeya. Global supply chain design : A literature review and critique [M]. Elsevier Ltd, 2005.
6HANDFIELD R B.Green Supply Chain:best practices from the furniture industry [J]. Proceedings-Annual Meeting of the De cision Sciences Institute, 2004, (3):220-225.