摘要
以合肥市滨湖新区塘西河再生水厂为例,介绍了半地下全覆盖式MBR再生水厂的工程设计要点。重点讨论了工艺设计、平面与竖向设计、结构设计、通风采光照明设计、除臭设计、绿化设计,对半地下全覆盖式再生水厂设计中的特殊问题予以说明。
Taking Tangxihe Water Reclamation Plant in Binhu new district, Heifei as example, the engineering design key points of semi-underground and fully covered water reclamation plant using MBR process are introduced. Designs of process, horizontal and vertical arrangements, structure, ventilation and lighting, deodorization, and greening are discussed. Special issues on the design of semi-underground and fully covered water reclamation plant using MBR process are described.