摘要
介绍在柳钢4号高炉实施的停炉时间为5h 45min的炉顶打水空料线停炉法,以及3天就达产的开炉方法。
The blow-out operation of spraying water in Furnace top and lowering stockline implement- ed in No.4 Blast Furnace during the blow-out time of 5 h and 45 min, and the blow-in operation to get de- sired output within 3 days were introduced.
关键词
高炉
停炉
开炉
操作
Blast Furnace
Blow-out
Blow-in