期刊文献+

一类新颖的冷贮备可修系统的维修模型(英文) 被引量:1

A Novel Repair Model for Cold Standby Repairable System
下载PDF
导出
摘要 本文研究由两不同型部件组成的冷贮备可修系统的最优化更换策略问题.在该系统中,修理工可多重休假且修理设备具有优先权.通过引入一类推广的泊松过程来模拟系统的运作状态,并结合新定义的更换周期,从理论上找出该系统经长期运行单位时间的期望损失的具体表达式.最后,通过事例,从直观上验证文中所涉及到的一些理论结果. In this paper, we study a cold standby repairable system with one repairman who can take vacations. The system consists of two different components, in which one component has priori- ty in use and repair. We quote an extended Poisson process (EPP) to describe the working state and the repair state of component 1,and consider a new replacement policy N based on the failed times of component 1 and the repair situations of component 2 at the end of a renewal cycle. The explicit ex- pression of the expected cost rate is derived, and the corresponding optimal replacement policy N" can he determined numerically. Finally, several numerical examples are given to illustrate the theo- retical results of the model in this paper.
出处 《应用数学》 CSCD 北大核心 2012年第4期824-833,共10页 Mathematica Applicata
基金 Supported by the National Natural Science Foundation of China (71173109) the Fundation Research Fund for the Central University of China (Y0201100265)
关键词 冷贮备 优先权 休假 推广了的泊松过程 更换策略 Cold standby Priority Vacation An extended Poisson process Replacement policy
  • 相关文献

参考文献10

  • 1WU Qingtai, WU Shaomin. Reliability analysis of two-unit cold standby repairable systems under Poissonshocks[J]. Applied Mathematics and Computation,2011,218:171-182.
  • 2ZHANG Yuanlin, WANG Guanjun. Replacement problem for a cold standby repairable system[J]. Int. J.Syst. Sci. -2006,37:17-25.
  • 3JIA Jishen,WU Shaomin. Optimizing replacement policy for a cold-standby system with waiting repairtimes[J]. Appl. Math. Comput. ,2009,214:133-141.
  • 4ZHANG Yuanlin,WANG Guanjun. An optimal replacement policy for a two-component series system as-suming geometric process repair[J]. Comput. Math. Appl. .2007,54: 192-202.
  • 5Lam Yeh. Geometric processes and replacement problem[J]. Acta. Math. Appl. Sin. ,1988,4:366-377.
  • 6Lam Yeh. A note on the optimal replacement problem[J]. Adv. Appl. Prob. ,1988,20:479-482.
  • 7LI Yuan,XU Jian. An optimal replacement policy for a repairable system based on its repairman havingvacations[J]. Reliability Engineering and System Safety ,2011,96:868-875.
  • 8WU Shaomin.Derek Clements-Croome. A novel repair model for imperfect maintenance[J]. IMA Journalof Management Mathematics,2006,17 :235-243.
  • 9ZHANG Yuanlin,WANG Guanjun. A deteriorating cold standby repairable system with priority in use[J]. European Journal of Operational Research,2007,183 :278-295.
  • 10Sheldon M Ross. Stochastic Processes[M]. 2nd ed. New York:Wiley,1996.

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部