桥梁施工技术在工程项目的建设过程中具有重要作用,其发展的关键是施工的技术水平。随着科学技术的进步和施工管理的发展,桥梁施工技术获得了很大的提高和改进。
Monitoring of vertical swivel construction of main arch rib is the key of construction control of concrete filled steel tube arch bridge.By establishing monitoring net according to construction control scheme,the status data of key parts of vertical swivel of main arch rib are collected,which provide precise and scientific parameters for vertical swivel construction in order to ensure the safety of vertical swivel of main arch rib.
出处
《交通标准化》
2012年第20期69-71,共3页
Communications Standardization
关键词
公路桥梁
施工
技术
concrete filled steel tube
main arch rib
construction control
vertical swivel