基于改进挣值法的项目进度监控研究 被引量:5

The Project Schedule Monitoring Based on Improved Earned Value Method
下载PDF
导出
摘要 在分析了传统挣值法存在的固有不足和缺陷的基础上,结合相关学者的研究成果,对进度预测公式进行修正,并结合网络计划技术,提出改进的挣值法,最后通过实例进行分析。该方法能监控到关键路径的变化,并可以得到非关键任务的浮动时间,能提供更深入的进度信息,为项目经理的决策提供可靠依据。 In order to improve overall situation of immune algorithm in the realization of production scheduling and further enhance its convergence speed, it introduces the thought of self - adaptive cloning crossover - muta- tion operator and population decomposition. The contrast of the simulated experimental results is the zero wait immune algorithm in solving of the flow shop scheduling problems, shows that the improved immune algorithm has certain advantages in avoiding population early maturation and improving convergence speed.
出处 《中国制造业信息化(学术版)》 2012年第10期12-15,19,共5页
基金 国家自然科学基金资助项目(61074146)
关键词 挣值法 项目管理 进度监控 Flow Shop Flow Shop Scheduling Immune Algorithm Self- adaption Population Decomposition
  • 相关文献

参考文献12

  • 1Fleming Q W, Koppelman J M. Earned Value Project Manage- ment [ M ]. 4rd ed. Newton Square, PA : Project Management In- stitute, 2010.
  • 2Lipke W,Zwikael O, Henderson K, et al. Prediction of project out- come:the application of statistical methods to earned value man- agement ande earned schedule performance indexes [ J ]. Interna- tional Journal of Project Management ,2009,27(4) :400 -407.
  • 3Anbari F T. Earned value project management method and exten- sions [ J ]. Project Management Journal,2003,34 (4) : 12 - 23.
  • 4Jacob D S, Kane M. Forecasting schedule completion using earned value metrics revisited [ J ]. The Measurable News, 2004 (3):1,11 -17.
  • 5Lipke W. Schedule is different [ J ]. The Measurable News, 2003 (3) :31 -34.
  • 6Lipke W. Earned schedule application to small projects [ J ]. The Measurable News,2011 ( 2 ) :25 - 31.
  • 7Vandevoorde S, Vanhoucke M. A comparison of different project duration forecasting methods using earned value metrics[ J]. In- ternational Journal of Projct Management, 2006,24 ( 4 ) : 289 - 302.
  • 8Vanhoucke M, Vandevoorde S. A simulation and evaluation of earned value metrics to forecast the project duration[ J]. Journal of the Operational Research Society, 2007,58 ( 10 ) : 1 361 - 1 374.
  • 9Henderson, K. Further developments in earned schedule[ J ]. The Measurable News,2004 ( 1 ) : 15 - 22.
  • 10Henderson K. Earned schedule in action [ J ]. The Measurable News,2005 ( 1 ) :23 - 30.

二级参考文献22

  • 1赵彤,何丰.探讨多层计划在大型工程项目上的应用[J].项目管理技术,2004,2(10):59-64. 被引量:1
  • 2周晓宏.项目管理中的挣值管理方法研究——兼与戚安邦同志商榷[J].数量经济技术经济研究,2005,22(4):143-148. 被引量:25
  • 3盛新江.浅论带关键路径的挣值法评价方法[J].技术经济与管理研究,2006(1):49-49. 被引量:37
  • 4KANTE J, WALSH J J. Toward more successful project management [M]. Information System Management, 2004.
  • 5LIPKE W. Connecting earned value to the schedule [J]. The Meas- urable News, 2005, 1 : 6-16.
  • 6FLEMING, KEPPELMAN. Earned Value Management: Mitigating the Risks Associated with Construction Projects [J]. Cost Engineer- ing, 2002, 9 (4): 32-36.
  • 7Al-Jibouri,Saad,Monitoring Systems and their Effectiveness for Project Control in Construction[J].International Journal of Proj ect Management,2003,21 (6):145 -154.
  • 8Anbari,Frank T.,Earned Value Project Management Method and Extensions[J].Project Management Journal,2003,34(4):12-23.
  • 9Wafa Alsakini,Proactive schedule management of industrial turnkey projects in developing countries[J].International Journal of Project Management,2004,22:75-87.
  • 10Bower,D.C.Phase Earned Value Analysis[C].Paper presented at the PMI Global Congress North America,Toronto,Canada.September,2005.

共引文献81

同被引文献39

引证文献5

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部