6Keeney,Kevin R,Application of building precooking to reduce peak cooling requirements,ASHRAE Trans v 103n 1 jan26-29,1997.
7W.L.Lee, F.W.H.Yik, P.Jones: A strategy for prioritizing interactive measures for enhancing energy efficiency of air-conditioned buildings, Energy 28(2003):877-893.
8路廷魁.空气调节设计手册[S].北京:中国建筑工业出版社,1995:255-278.
9黄翔,连之伟,哈文.空调工程应用[M].北京:科学出版社,1997.
10Thomas E.Cappellin.VAV system-What makes them succeed? What makes them fail[J].ASHRAE Transactions,1997,103(2):814-821.