摘要
通过对昆钢 2 5 0加热炉风机电机过负荷运行的分析诊断 ,判断出原因 ,并采取相应措施 ,基本满足了加热炉运行和轧钢生产的需要 。
Based on analysis and diagnosis of overload operation of blast motor in 250 heating furnace of Kunming Iron & Steel Co.,causes were examined and corresponding measures were adopted,which met the needs of operation of the heating furnace and production of steel rolling,and avoided occurrence of accidents of the equipment.
出处
《冶金动力》
2000年第3期3-4,共2页
Metallurgical Power
关键词
加热炉鼓风机
轧钢
电机负荷
blast of heating furnace,heat exchanger,leakage,diagnosis