介绍了石油工程建设大中型项目广泛实施的"三查四定"的施工原则和实施过程中出现的主要问题,对产生问题的原因进行了理论分析,并提出合理建议,包括实施EPC一体化、加强设计人员培训和质量进度控制。
This paper introduces the construction principle of 'three examinations and four decisions' which is widely implemented in large and medium sized petroleum engineering projects,as well as the main problems appeared in the process.The reasons for problems are theoretically analyzed,the reasonable proposals are put forward including EPC integral implementation,design personnel training enhancement and quality and schedule controls.