1Polak M A,Lasheen A.Mechanical modelling for pipes in horizontal directional drilling [J].Tunnelling and Underground space Technology,2002, 16( 1 ):47-55.
2Baumert M E.Allouche E N.Methods for estimating pipe pullback loads for HDD crossings [J] .J Infrastruct Syst., 2002,(8) : 12-19.
3Knight M A,Duyvestyn G,Gelinas M.Excavation of surfaee installed pipeline [ J ].In Journal of Infrastructure Systems,2001,7(3): 123-129.