针对某取水泵站投入运行后场区碎石土回填基础出现沉降的原因进行了分析,通过研究比选采用灌浆加固方案,对灌浆施工关键点及特殊情况处理进行了阐述,以保证场区稳定、安全。
The paper analyzes the reasons for the settlement of the gravel soil back-filled foundation at the site after some pumping station was op erated, and illustrates the key points for the grouting construction and some treatment for some special circumstances by comparing and analyzing the grouting consolidation schemes, so as to ensure the site to be stable and safe.
出处
《山西建筑》
2012年第31期81-82,共2页
Shanxi Architecture
关键词
碎石土
基础处理
灌浆施工