期刊文献+

浅埋偏压连拱隧道施工数值模拟分析

On numeric simulation analysis of construction of shallow and unsymmetrical double-arch tunnel
下载PDF
导出
摘要 针对浅埋偏压连拱隧道,采用中导洞施工方法,对浅埋偏压连拱隧道的两种不同施工顺序(先挖深侧后挖浅侧或先挖浅侧再挖深侧)进行数值模拟,分析两种不同施工顺序下围岩应力、位移,中墙应力、位移及初期支护内力、位移的变化值,得出"先浅后深"施工顺序优于"先深后浅"施工顺序。 Based on the features of the shallow and unsymmetrical double-arch tunnel, the paper adopts the middle heading method to undertake the numeric simulation of the shallow and unsymmetrical double-arch tunnel in two difference orders, which include the excavation of the shallow side is followed by the excavation of the deep one and the excavation of the deep side by the excavation of the shallow one, analyzes the surround- ing rock stress, the displacement, the stress of the middle wall, the displacement and the primary support internal stress, and the changing value of the displacement in the two construction orders, and concludes the construction order of the shallow excavation followed by the deep one is su- perior to the order of the deep excavation followed by the shallow one.
作者 王舒
出处 《山西建筑》 2012年第31期177-179,共3页 Shanxi Architecture
基金 贵州民族大学科研基金资助项目(项目编号:校科研2011(3)号)
关键词 连拱隧道 浅埋偏压 数值模拟 应力 位移 double-arch tunnel, shallow and unsymmetrical pressure, numeric simulation, stress, displacement
  • 相关文献

参考文献2

二级参考文献2

共引文献832

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部