摘要 以东路高架桥边跨合龙段施工工程为背景,采用平面杆系程序对边跨合龙方案由落地支架施工更改为吊架施工的桥梁结构进行了对比分析.研究结果表明,采用不同的边跨合龙方案对主梁在施工阶段、成桥阶段的受力状态影响较小.并对当过渡墩较高或支架需搭设在水中时,采用吊架施工的可行性进行了探讨. Based on side span closure construction of Donglu Viaduct Bridge as project background,this paper comparatively analyzed the bridge structure whose side span closure scheme has been changed from consol supports to hanger.Results showed that mechanical behaviors of main girder rarely changes in the construction stage and the orperation stage.The construction feasibility has been discussed in the circumstances that transition pier is high or consol supports must be erected in water.
出处 《长沙理工大学学报(自然科学版)》 CAS 2012年第3期24-29,共6页 Journal of Changsha University of Science and Technology:Natural Science
基金 国家自然科学基金资助项目(51178059 51108046)
关键词 刚构-连续组合体系 边跨合龙方案 应力比较 线形比较 frame-continuous conbination system side span closure scheme stress comparison alignment comparison
  • 相关文献

参考文献8

二级参考文献23

共引文献209

同被引文献12

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部