期刊文献+

包钢中磷铁水预处理100kg级热模拟试验研究 被引量:5

100 kg Scale Hot Simulation Test and Study on Pretreatment of Medium-Phosphorus Hot Metal in Baotou Iron & Steel Rare Earth Company
原文传递
导出
摘要 介绍了在 1 0 0kg中频感应炉上模拟复吹转炉 ,采用石灰基烧结渣等原料作为脱磷剂 ,对含0 .2 %左右含磷量中磷铁水进行脱磷处理的方法及结果。该项研究对工业生产中 ,采用转炉双联法铁水脱磷预处理有一定的指导作用。 Simulating combined blow converter on 100 kg HF furnace with CaO based sintered slag used as the dephosphorizing agent,this paper introduces the method and result of dephosphorization of medium-phosphorus hot metal with about 0.2 % in phosphorus content.This research is of directive importance for dephosphorization pretreatment of hot metal with duplex converter in production.
出处 《炼钢》 CAS 北大核心 2000年第4期26-29,33,共5页 Steelmaking
关键词 铁水预处理 脱磷 热模拟试验 中磷铁水 pretreatment of hot metal dephosphorization hot simulation test
  • 相关文献

参考文献6

  • 11,T Matsuo.I Yamazaki,SMasuda.Development of of New Hot Metal Dephosphor Zation Process in Hop and botton BlowingVonverter Prsirted at 73 rd Steelmaking Conference of ISS-AIME March 1990 Detmit USA.
  • 22,TIkedaandTMatsuo.TransISIF.1982,(22);495
  • 33,OYamaseetal.Tetsu-to-Hagane,1987,(73)
  • 44,MSumitaetal.Tetsu-to-Hagane,1983,(69)
  • 55,YTakemureetal.Tetsu-toHagane.1987(73)
  • 6片桐望.铁と钢,1981,67(12):870-870.

同被引文献45

引证文献5

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部