摘要
论述轨道交通换乘设施一体化的概念和必要性,并以西安地铁为例,详细阐述开展此项工作的规划方法,包括建立车站功能分级体系、确定车站换乘方式、计算换乘设施用地规模、确定换乘设施用地红线、规划设计换乘设施用地布局等,最后提出西安地铁开展换乘设施一体化工作的相关建议。
This paper discusses the concept and necessity of transfer facilities integration for urban rail transit,and taking Xi'an metro as an example,elaborates planning process involved,including establishing the station classification system,defining the station transfer mode,calculating land size and fixing land boundary line for transfer facilities,planing land layout for transfer facilities and so on.Related suggestions for integrated transfer infrastructure of Xi'an metro are put forward in the end.