摘要
阐述既有线控制中心改移设计的难点和要点,从系统设备的移设、倒换、新设和控制中心的使用要求等多个方面,确保系统设备之间的兼容性和改移实施的可操作性,达到将实施风险降到最低、对运营的影响减到最小的目的。
This paper presents the main issues of control center relocation design and its complexities.By making investigations into many aspects such as equipment relocation,equipment replacement,adding equipment and control center users' requirements,etc.,it is possible to ensure the comp-atibility between system equipment,make relocation achievable,and minimize the project's exposure to risk and the potential influence on daily operation.
出处
《都市快轨交通》
北大核心
2012年第5期127-130,共4页
Urban Rapid Rail Transit
关键词
北京地铁
既有控制中心
改移
通信设计
Beijing subway
existing control center
relocation
communication design