期刊文献+

Multi-satellite observation integrated scheduling method oriented to emergency tasks and common tasks 被引量:22

Multi-satellite observation integrated scheduling method oriented to emergency tasks and common tasks
下载PDF
导出
摘要 Satellite observation scheduling plays a significant role in improving the efficiency of satellite observation systems.Although many scheduling algorithms have been proposed,emergency tasks,characterized as importance and urgency(e.g.,observation tasks orienting to the earthquake area and military conflict area),have not been taken into account yet.Therefore,it is crucial to investigate the satellite integrated scheduling methods,which focus on meeting the requirements of emergency tasks while maximizing the profit of common tasks.Firstly,a pretreatment approach is proposed,which eliminates conflicts among emergency tasks and allocates all tasks with a potential time-window to related orbits of satellites.Secondly,a mathematical model and an acyclic directed graph model are constructed.Thirdly,a hybrid ant colony optimization method mixed with iteration local search(ACO-ILS) is established to solve the problem.Moreover,to guarantee all solutions satisfying the emergency task requirement constraints,a constraint repair method is presented.Extensive experimental simulations show that the proposed integrated scheduling method is superior to two-phased scheduling methods,the performance of ACO-ILS is greatly improved in both evolution speed and solution quality by iteration local search,and ACO-ILS outperforms both genetic algorithm and simulated annealing algorithm. Satellite observation scheduling plays a significant role in improving the efficiency of satellite observation systems.Although many scheduling algorithms have been proposed,emergency tasks,characterized as importance and urgency(e.g.,observation tasks orienting to the earthquake area and military conflict area),have not been taken into account yet.Therefore,it is crucial to investigate the satellite integrated scheduling methods,which focus on meeting the requirements of emergency tasks while maximizing the profit of common tasks.Firstly,a pretreatment approach is proposed,which eliminates conflicts among emergency tasks and allocates all tasks with a potential time-window to related orbits of satellites.Secondly,a mathematical model and an acyclic directed graph model are constructed.Thirdly,a hybrid ant colony optimization method mixed with iteration local search(ACO-ILS) is established to solve the problem.Moreover,to guarantee all solutions satisfying the emergency task requirement constraints,a constraint repair method is presented.Extensive experimental simulations show that the proposed integrated scheduling method is superior to two-phased scheduling methods,the performance of ACO-ILS is greatly improved in both evolution speed and solution quality by iteration local search,and ACO-ILS outperforms both genetic algorithm and simulated annealing algorithm.
出处 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2012年第5期723-733,共11页 系统工程与电子技术(英文版)
基金 supported by the National Natural Science Foundation of China (61104180) the National Basic Research Program of China(973 Program) (97361361)
关键词 satellite scheduling emergency task ant colony optimization(ACO) iteration local search(ILS) acyclic directed graph model satellite scheduling emergency task ant colony optimization(ACO) iteration local search(ILS) acyclic directed graph model
  • 相关文献

参考文献1

二级参考文献10

  • 1Vasquez M, Hao J K. Upper bounds for the spot5 daily photograph scheduling problem[J]. Journal of Combinato rial Optimization, 2003, 7(1) :87-103.
  • 2Frank J, Jonsson A, Morris R, et al. Planning and scheduling for fleets of earth observing satellites[C]//Proceeding of the 6th International Symposium on Artificial Intelligence, Robotics, Automation and Space. Montreal: i- SAIRAS, 2001.
  • 3Wolfe W J, Sorensen S E. Three scheduling algorithms applied to the earth observing systems domain[J]. Management Science, 2000, 46(1) :148-168.
  • 4Maenner R, Manderick B. Parallel problem solving from nature[C] // Proceedings of the Second Conference on Parallel Problem Solving from Nature. Amsterdam: North-Holland, 1992.
  • 5Caseau Y, Laburthe F. Cumulative scheduling with task intervals [C] // Proceeding of Joint International Conference on Logic Programming 1996. Massachusetts: Massachusetts Institute of Technology, 1996:363-377.
  • 6Wang J, Jing N, Li J. A multi-objective imaging scheduling approach for earth observing satellites[C] // Proceed ingof GECCO'07. London: ACM, 2007:2211 -2218.
  • 7Gabrel V, Vanderpooten D. Enumation and interactive se lection of efficient paths in a multi-criteria graph for scheduling an earth observing satellite[J]. European Journal of Operation Research, 2002, 139(3) :533-542.
  • 8Damiani S, Verfaillie G, Charmeau M. A continuous anytime planning module for an autonomous earth watching satellite[C] //Proceeding of ICAPS 2005. California: AAAI Press, 2005: 19-28.
  • 9Kramer I. A, Smith S F. Task swapping for schedule improvement .. a broader analysis[C]//Proceeding of International Conference on Automated Planning and Scheduling 2004. Whistler: AAAI, 2004: 235-243.
  • 10Lee S, Jung W C, Kim J H. Task scheduling algorithm for the communication, ocean, and meteorological satellite[J]. ETRIJournal, 2008, 30(1) :1-12.

共引文献2

同被引文献272

引证文献22

二级引证文献104

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部