摘要
概括分析了沪昆客运专线怀化某段工程地质问题,根据对线路的影响大小,分别有针对性地提出了相应的治理措施。
This article provides a case history of the engineering geological problems encountered in Huaihua Section of Shanghai-Kunming Passenger Rail.Adverse geological conditions were mitigated accordingly based on their potential impact on the rail alignment.
出处
《土工基础》
2012年第5期72-74,共3页
Soil Engineering and Foundation
关键词
不良地质
特殊岩土
岩溶
采空区
断层
Adverse Geological Conditions
Special Geotechnical Conditions
Karst Terrain
Mining Voids
Geological Faults