摘要
硫化设备基础传统模式一般采用地下管沟式,设备支撑一般为现浇块状大体积混凝土。现采用钢筋混凝土构架式基础,实现通畅、开阔的大空间,有利于管线排布,方便管线检修,一定程度上改善了硫化机设备下的工作环境。该方案可根据厂家具体情况予以考虑。
The traditional mode of curing equipment foundation is underground trench,and device supports are usually large cast-in-place concrete block.Now we use reinforced concrete frame foundation,to achieve smooth and open space.It is conducive to the pipelines arrangement,to facilitate the maintenance of pipelines,to improve the work environment of vulcanizing machine equipment to some extent.The program can be taken into account in accordance with the specific circumstances of the manufacturers.
出处
《橡塑技术与装备》
CAS
2012年第10期46-50,共5页
China Rubber/Plastics Technology and Equipment