大相岭泥巴山隧道岩爆防治数值模拟分析 被引量:2

Numerical Simulation Analysis of Rockburst Prevention in the Nibashan Tunnel
下载PDF
导出
摘要 大相岭泥巴山隧道为雅安—泸沽高速公路的控制性工程,由于隧道埋深大、地应力高、穿越的地层主要为硬脆性围岩,洞室开挖后岩爆时有发生。文章以该工程为背景,通过数值模拟分析了开挖中采用锚喷支护措施对减弱或防治岩爆的效果,并对不同锚杆长度和间距的防治效果进行了对比分析。结果表明:采用锚喷支护能够降低最大主应力、增大最小主应力、减少主应力差,可以有效降低岩爆的烈度;采用间距1m、长度3m的锚杆进行锚喷支护最经济有效。 The Nibashan tunnel is the key project on the Ya'an - Lugu highway, and rockbursts occur frequently after excavation due to the depth, high geostress, and brittleness of the surrounding rock. Thus it is necessary to effectively prevent and treat rockburst in order to ensure the safety of personnel and equipment. Using this project as a background, this paper analyzes the effects of such preventive measures as sprayed concrete and rockbolts and compares different bolt lengths and spacings using a numerical model. The results indicate that the application of sprayed concrete and rock bolts can reduce the maximum principal stress, increase the minimum principal stress, reduce the difference of principal stress, and effectively reduce the intensity of rockbnrsts. It is very cost effective to use the 3m rock bolt with a spacing of 1m.
出处 《现代隧道技术》 EI 北大核心 2012年第5期51-55,共5页 Modern Tunnelling Technology
基金 交通部西部交通科技资助项目(2006318000104)
关键词 公路隧道 岩爆防治 数值模拟 锚喷支护 Highway tunnel Rockburst prevention Numerical simulation Support with sprayed concrete and rock bolts
  • 相关文献

参考文献7

二级参考文献127

共引文献520

同被引文献41

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部